Skip to content Go to main menu
Seondo’s References

Power

Seondo Electric is actively involved in all core areas of South Korea's power industry.
Orderer Detail Period
Daedong Substation, etc. 154kV Transmission line protection panel, Bus protection panel, Transformer protection panel 2024 Year
West-Anseong Substation, etc. 345kV Transmission line protection panel, Transformer protection panel, Breaker failure protection panel 2022 ~ 2024 Year
Shin-Seosan Substation, etc. 765kV Transmission line protection panel, Transformer protection panel, Bus protection panel, Breaker failure protection panel 2021 ~ 2024 Year
Guri, Taepyeong Substation 25.8kV E-GIS 2023 Year
Shin-Sihwa Substation, etc. 345kV Underground line fault detection device 2023 Year